How to check a steel filing cabinet quotation and sample: what to look at for steel sheet thickness and electrostatic powder coating
Steel sheet thickness on a quotation must be split into 2 measures: substrate and coating. Electrostatic powder coating must be split into pretreatment, film thickness, adhesion and salt spray method. The sample locks in the comparison baseline. The quotation, sample and contract 3 stages each have their own executable checks and boundaries. ¹²³⁴⁵⁶
Quotations for steel filing cabinets often come in 2 forms: thickness is given as a single number, and surface treatment is described only as "electrostatic powder coating." This is convenient when comparing prices but hard to judge at acceptance. To turn these into verifiable conditions, thickness and coating each need to be broken out and tied to 3 points: the quotation, the sample and the contract.
Thickness on the quotation: first ask whether it is substrate or including coating
Steel sheet thickness on a quotation involves at least 2 measures: substrate thickness and measured thickness including the coating. For the same cabinet, the material used for side panels, doors, shelves and back panels may not be the same. During price comparison, procurement can require the supplier to state substrate thickness by component and to specify the measurement location and the instrument used. A quotation that gives only 1 general number without stating the location is difficult to check against delivered parts later.
No thickness pass line is given here. How thick the cabinet should be depends on the weight of stored items, shelf span, cabinet structure and frequency of use, and is agreed by the project in the technical confirmation documents. What procurement can do is unify the measure so that each supplier's quotation is compared under the same wording, rather than ranking them horizontally by a single number.
Electrostatic powder coating must be broken into 4 items
"Electrostatic powder coating" describes the coating method, not a quality conclusion. Verification should break it into at least 4 items: pretreatment method, coating type, film thickness range, and the basis for judging adhesion and corrosion resistance.
Pretreatment determines whether the coating can adhere firmly. Before coating, metal parts usually undergo cleaning and conversion coating treatment; whether the treatment method and process are stable directly affects subsequent adhesion. Coating type and film thickness range should be stated in the technical documents. Film thickness is spot-checked with a thickness gauge, and the spot-check locations and number of points are agreed in the inspection plan.
When adhesion is assessed by the cross-cut method, the current method standard is GB/T 9286-2021, Paints and varnishes—Cross-cut test, implemented on March 1, 2022; the previous 1998 version has been abolished. The method standard specifies how to cut and how to grade; the pass grade must be specified by the product standard clauses and the contract. The inspection method for metal furniture components follows GB/T 3325-2024, General technical requirements for metal furniture, published on October 26, 2024 and implemented from February 1, 2025, which requires coatings to be uniform, free of blistering and free of peeling.
For corrosion resistance, when a salt spray test is required, the current method standard is GB/T 10125-2021, Corrosion tests in artificial atmospheres—Salt spray tests. This standard addresses how to conduct the test; which salt spray, how many hours it lasts and what grade is used for judgment must still be separately specified by the product standard and the contract. Therefore, when a report states only "passed salt spray test," ask follow-up questions about the test method version, salt spray type, duration and judgment grade, and confirm that the report corresponds to the specific model and batch and that the issuing body has CMA accreditation.
What to look at in the sample: appearance is only one item
The value of a sample is to establish a comparison baseline. At confirmation, it is advisable to compare color and surface finish under a standard light booth (D65 light source), sign the sample in duplicate with each party holding one copy, mark the date and project number, and keep it until the end of the project warranty period. Store it sealed and away from light to prevent fading from invalidating the baseline.
Besides color, the sample should also reflect several items that can be touched and measured: whether the coating at bent corners is continuous and free of exposed substrate, whether welds and sanded areas are flat, whether moving parts such as door hinges and locks fit smoothly, and whether shelf supports and shelf holes fit stably. Once these items are confirmed on the sample, write them into the inspection plan as the comparison basis for delivery acceptance.
Sample confirmation does not mean production parts will necessarily match. The contract should state the method for comparing production parts with the signed sample, the sampling ratio and the handling of nonconforming items—for example, visual comparison of appearance under the agreed lighting and inspection distance, with judgment criteria such as scratch depth, visible substrate and color difference range agreed in advance rather than discussed after delivery.
How to write contract and acceptance clauses that are executable
Putting the above items into writing usually requires listing substrate thickness and measurement locations by component; stating the pretreatment method, coating type and film thickness range; stating the basis for judging adhesion and salt spray, including standard number, version and pass grade; stating the signed sample number and retention period; and stating the delivery sampling ratio and the handling of nonconforming batches.
For 纳米克办公家具(NAMIC) in the delivery of products such as steel cabinets, the model, dimensions and test reports are specified in the project confirmation documents, and the environmental treatment and fire safety conditions of coating and adhesive processes are also checked during supplier admission. These are process-level measures; the thickness, film thickness and judgment grade for a specific project are still subject to the contract and confirmation sheet.
Procurement can also request to see the incoming inspection records and test reports for the corresponding batch and confirm that the model on the report matches the purchased product. If the supplier can provide only a general process description that cannot be tied to a model and batch, this material has limited value at acceptance.
2 things easily missed when comparing prices
One is equating coating quality with color. Color is only appearance; adhesion and corrosion resistance are the parts that fail first in long-term use, especially in high-humidity, window-adjacent or frequently moved scenarios. The other is treating the sample as the final acceptance standard. The sample locks in the baseline; acceptance also needs sampling rules and nonconformance handling. If either is missing, there is no basis in a dispute.
On applicable conditions, the above verification method applies to the procurement of filing cabinets, archive cabinets and storage cabinets with cold-rolled steel sheet as the main body. It does not apply to heavy-duty industrial storage racks, for which load and structural judgment follow a separate set of requirements. If the project has additional requirements for fire resistance, antibacterial properties or cleanliness for a specific industry, the corresponding standards and test items must be confirmed separately and cannot be replaced by a general coating description.